• Natural Gas News

    Pulse.com.gh: Power Situation Stabilizes as Atuabo Gas Plant Comes Through

    old

Summary

Volta River Authority engineers say Ghana's Aboadze Thermal Plant is working at higher levels thanks to the mending of the Atuabo Gas Plant compressor

by: Erica Mills

Posted in:

Press Notes, Africa

Pulse.com.gh: Power Situation Stabilizes as Atuabo Gas Plant Comes Through

There is some good news for Ghanaians as the current energy crisis might be solved earlier than government’s November deadline due to new development in the country’s energy sector.

According to engineers from the Volta River Authority,  the  Aboadze Thermal Plant which was producing 200 MW of power is now producing 350 MW as at Tuesday afternoon.  

This is because the faulty compressor at the Atuabo Gas Plant has been fixed and is now supplying more gas than before.

Read the full article HERE.