• Natural Gas News

    Graphic Online: Reverse Gas Flow Between Atuabo, WAPCo Begins in March

    old

Summary

Ghana's government cabinet has given the Ministry of Petroleum six months to connect the Atuabo gas pipeline to the WAGP to enable reverse gas flow

by: Erica Mills

Posted in:

Press Notes, Africa

Graphic Online: Reverse Gas Flow Between Atuabo, WAPCo Begins in March

Cabinet has given the Ministry of Petroleum up to March, next year, to connect the Atuabo Gas pipeline in the Western Region to the West Africa Gas Pipeline (WAGP) to enable reverse flow of gas between the two lines.

The six months ultimatum follows an approval from the highest policy decision body of the government to the ministry to continue with processes aimed at connecting the two gas pipelines which are central to the production of adequate electricity in the country.

Read the full article HERE.