Asoko Insight: Poor Timing Could Cause Gas Glut (Ghana)
If government does not get the timing right, its pursuit of both local gas projects and imported LNG could result in a glut of the commodity by 2018, when a number of gas projects are expected to turn up.
While gas is expected from the TEN and Sankofa Fields in the next few years, General Electric and Quantum Power are pursuing LNG projects, all of which are aimed at cutting out the erratic supply of gas for power generation.
Read the full article HERE.