GhanaWeb: Lack of Gas Pipelines Could Jeopardize Gas Production
When Ghana Gas begins production at full capacity in April, thermal plants at Takoradi in the Western region will get more than they can ever utilize, while plants at Tema, in the Greater Accra Region will not be able to sniff a whiff of energy-producing gas.
It is because there will be no gas pipeline capable of transporting gas from the Takoradi base of the Jubilee oil fields to thermal plants in the south of Accra.
Read the full article HERE.