Daily News Egypt: EGAS Studies Preparing Adabiya Port to Receive 2nd Gasification Ship
The Egyptian Natural Gas Holding Company (EGAS) is looking into preparing Adabiya Port in Suez to be able to receive the second gasification ship, after being unable to receive it in Sokhna Port for security reasons.
A senior official at EGAS said in a statement that a committee from the company was sent to study Adabiya Port. The committee agreed that the port can be prepared within a period of three to six months so that it can receive the second gasification ship to import an additional 500m cubic feet of gas daily.
Read the full article HERE.