Australia's Triple Energy to Begin Drilling for CSG in China's Heilongjiang Province
Australia listed Triple Energy will soon begin to drill for coal seam gas in China’s Heilongjiang province.
The Aolong Joint Venture (80 percent profit interest to Triple) and coal seam gas specialist drilling company Beijing JiuZun Energy Technology Co. Ltd. (JiuZun) have now arranged for the drill pads and roads to be constructed and the rig has been mobilized to the site of the first of 2 wells to be drilled during 2015, the company said Monday.
The first of these wells, Niaoshan-1, will be drilled in the Bird Mountain area, located around 1.2 miles (2 kilometers) from the previous Xian Xian-1 well drilled in 2013. The well is targeting several major coal seams for intersection which will be cored for desorption analysis, fracked and production tested.
This well is planned to be drilled to a depth of approximately 4,265 feet (1,300 meters), which is expected to take around six weeks, inclusive of coring and fraccing.
The second well of 2015 will follow with the same rig once operations at Niaoshan-1 are complete.