• Natural Gas News

    Graphic Online: Experts Raise Red Flags Over Atuabo Gas Shutdown

    old

Summary

Ghanaian industry experts are asking why Ghana Gas has shut the Atuabo Gas Processing Plant just three weeks after it was declared to be producing commercially

by: Erica Mills

Posted in:

Press Notes, Africa

Graphic Online: Experts Raise Red Flags Over Atuabo Gas Shutdown

Industry experts are questioning the planned shutdown of the billion-dollar Atuabo Gas Processing Plant, which came in less than three weeks after the declaration of commercial production.

The experts find it even more intriguing that the Ghana National Gas Company (Ghana Gas) which owns the plant allowed Sinopec, the Chinese firm which built the plant, to also act as the operations and maintenance (O&M) contractors, even when the defect liability period had not expired.

Read the full article HERE.