TV3 Network: Atuabo Gas Processing Plant Resume Operations After Mandatory Shutdown
The Atuabo Gas Processing Plant in the Ellembele District of the Western Region, which was shut down on April 20 for mandatory maintenance has resumed operations.
The maintenance works was concluded last Wednesday April 29, 2015.
The Ghana Gas Company, which began operations in November last year, on April 10 2015, said aside the required safety procedures, the planned shutdown was needed for warranty assurance and viability of its operating insurance.
Read the full article HERE.